Construction of the new Port Authority building advances
Coatzacoalcos, March 20, 2015.
Continuing with breakthrough construction of the building of harbourmaster, which is built on a total area of 1,168m2, inside the Coatzacoalcos port area.
This important work integrates: vehicle parking with 28 drawers, ramps for people with disabilities, waiting room, dining room, boardroom, emergency exits, among other areas.
The building will consist of two levels and two external modules, these will be enabled for federal agencies SAGARPA and International Health.
The old building had more than 50 years of operation, so that a total renovation in structure and proper operation was necessary.
Continuing with breakthrough construction of the building of harbourmaster, which is built on a total area of 1,168m2, inside the Coatzacoalcos port area.
This important work integrates: vehicle parking with 28 drawers, ramps for people with disabilities, waiting room, dining room, boardroom, emergency exits, among other areas.
The building will consist of two levels and two external modules, these will be enabled for federal agencies SAGARPA and International Health.
The old building had more than 50 years of operation, so that a total renovation in structure and proper operation was necessary.